361
In winter and summer, due to the influence of low temperature, it will have a certain impact on the normal operation of color steel tile equipment. Therefore, the maintenance of color steel tile equipment in winter should be particularly strengthened. The specific maintenance steps are as follows:
1. Carry out comprehensive maintenance work on color steel tile equipment
Replace the "three filters" and oil of the engine, replace or adjust the belt, check whether the performance of the fan, water tank, generator and compressor is reliable, and perform maintenance, repair or replacement if necessary.
2. Specially strengthen the maintenance work for the working area affected by temperature
Check whether the cooling system and fuel system are unobstructed, and replace the aging wires, plugs, fuel pipes, screws, and tighten the fuel pipes to prevent fuel leakage. Clean up the oil and dust on the engine body to ensure that the engine is "lightly loaded". Always check whether there is oil leakage, especially the fuel, which should be replenished in time.
3. Line problems of color steel tile equipment
Check that each circuit connector should be firm and reliable, the aging circuit should be replaced, and the fuse capacity should meet the requirements for safe use. The combination of forced heating and natural heating is used to improve the low-temperature operation integrity rate of color steel tile equipment.